Key requirements include:
- Minimum 18 ft frontage and strong daytime traffic.
- Venting for a Type 1 hood (for our prep line).
- Patio seating is preferred but not mandatory.
We provide a prototype floor plan, décor palette, and equipment list. You must use an approved construction-management firm; build-out averages 8-12 weeks (Item 7 note 6).